Before going sailing on a small boat, you need to rig the boat with the sails, sheets, The halyards are used to raise both the jib and mainsail. Even so mundane a task as hoisting a mainsail.
After first rigging a three- legged system, the author found four legs worked better. Here you will learn about the parts of a sail, the standing rigging and the running rigging.
Sailing The main sail is the primary propulsion for a sailboat. It is an.
Boom: Spar at the bottom of the mainsail Shrouds: Pieces of standing rigging that hold the mast up from side to side (See next page for diagram). (figure 6).
The main types of mainsheet rigging systems on a dinghy are [ centre ] and [ aft ] as per the mainsheet rigging diagrams. The former of the mainsheet rigging.Parts of a Sailboat Rigging. Next lesson -> Parts of and types of sails Index: How to sail.
Mast – An upright spar, that is typically the center of the rig and the tallest spar where the mainsail is set from and the boom is attached. MainSail – The sail aft of the mast attached to the boom. While slowly easing the main halyard, take in the reefing control line. This pulls the bottom of the mainsail down toward the boom.
When the sail reaches the desired reef point, secure the halyard and the reefing line, go back on course, and trim the sail. 3.
Rigging Descri tion and Use. Your new boat will be rigged and commissioned by your Catalina dealer.
Your Catalina dealer will be happy to answer any questions you may have and demonstrate the basic operation of your Expo by sailing with you after launching. See section Mainsail Rigging Diagram on page 7 for rigging your boat.
Sailboat Rigging. Assembling the rigging of our boats has been made as basic and efficient as possible. Here is a diagram of the rigging.
Click the image for a larger view. 1) Assemble the mast (video time ) Slide the bottom section of the mast into the top section.
Make sure the joint is clean! Attach the mainsail () A.
Attach. MAINSHEET #1.
Typical Aussie Skiff mainsheet system. Popular on skiffs and other dinghies up to m (18ft) in length. end-boom purchase, commonly fixed to a bridle at the transom, with sheeting direct from the boom to facilitate ‘speedie’ sheeting-in.WEEKS Service 3Gaff rig – Wikipedia